First Street Environmental Study Report

The Town of Collingwood carried out a Schedule C Class Environmental Assessment (EA) in accordance with the Municipal Engineers Class Environmental Assessment (for road, water, and waste water projects) to assess the transportation and infrastructure problems in the Highway 26 connecting link and to determine a preferred solution to improve the situation.
The full report can be viewed by downloading the attached file.

First Street Environmental Study (PDF)7.1 MB