The Town of Collingwood will be receiving Tenders for:
TENDER No. PW2010-01
RECONSTRUCTION OF POPLAR SIDEROAD - 10TH LINE TO HIGHWAY 26 NEW
RESURFACING OF 10TH LINE - POPLAR SIDEROAD TO SIXTH STREET
RESURFACING OF RAGLAN STREET - HUME STREET 1.1KM SOUTH
Tenders will be accepted until: Wednesday, July 14, 2010 @ 1:00 pm
Tenders will be opened: Wednesday, July 14, 2010 @ 1:15 pm
The work will include the following:
Reconstruction of Poplar Sideroad from 10th Line to Hwy 26 New
-
Pulverize approximately 43,000 m2 of existing asphalt and underlying granulars
-
Reconstruct Poplar Sideroad with Granular A grade raise and full widening including 600mm Granular B/Pulverized material, 150mm Granular A, 60mm Superpave 19.0 and 40mm Superpave 12.5
-
Construct approximately 4,700 m of concrete curb and gutter and 5,500 m of subdrain
-
Construct urban road section from west of High Street to Hurontario Street/County Road 124
-
Construct a modern roundabout at the intersection of Poplar Sideroad and High Street
-
Replace all driveway and road crossing culverts
-
Place pavement markings for a total length of 17,500 m
-
Restore all disturbed areas with topsoil and sod/seed & mulch
-
Install pedestrian signals (provisional) and railway crossing signals
-
Extend the existing watermain along Poplar Sideroad, including bore and jack under the existing railway (provisional) approximately 650 m
Resurfacing of 10th Line from Poplar Sideroad to Sixth Street
-
Pulverize approximately 12,400 m2 of existing asphalt and underlying granular
-
Place approximately 13,100 m2 of 150mm Cold Recycled Mix and 40mm Superpave 12.5
-
Replace one 750 mm cross culvert
-
Adjust all driveways
-
Place pavement markings for a total length of 1900 m
Resurfacing of Raglan Street from Hume Street approximately 1.1km south
-
Pulverize approximately 7,100 m2 of existing asphalt and underlying granular
-
Place approximately 7,100 m2 of 150mm Cold Recycled Mix and 40mm Superpave 12.5
-
Adjust approach grades at railway crossing (no change in grade at crossing)
-
Adjust all driveways
-
Place pavement markings for a total length of 1100 m
Complete drawings and tender documents will be available at 12:00 on Wednesday June 23, 2010 at the office of the Consulting Engineers between 8:30am to 5:00pm, Monday to Friday for the non-refundable sum of ($200.00 - Cash or Cheque only), including GST payableto C.C. Tatham & Associates.
Tenders clearly marked ‘Tender PW2010-01’ in sealed envelopes will be received by Sara Almas, Clerk no later than 1:00pm Wednesday July 14th, 2010.
The lowest or any tender will not necessarily be accepted.
Submit Tenders to: Consulting Engineers:
Town of Collingwood C.C. Tatham & Associates Ltd.
97 Hurontario Street 115 Sandford Fleming Drive, Suite 200
Collingwood, ON L9Y 3Z5 Collingwood, ON L9Y 5A6
Sara Almas, Clerk Michael Cullip, P.Eng.
Town of Collingwood Director, Manager - Transportation Engineering