
Notice of Public Information Centre – December 8, 2026
The Town of Collingwood is undertaking a Municipal Class Environmental Assessment (Class EA) to improve the effectiveness of drainage systems within the Highway 26 corridor. Specifically, the Town is considering options to address flooding within Cranberry Trail West, just south of Highway 26.
The objective of this EA is to improve the effectiveness of drainage systems in the project area, illustrated below. This work is in addition to and complements the research and findings in the recently finalized Stormwater Management Master Plan (SWMMP). These alternative solutions are being evaluated through the Schedule B process of the Municipal Class Environmental Assessment. Outcomes from consultation with the public, technical agencies, and other stakeholders will inform the study recommendations.
A Public Information Centre (PIC) is being held on December 8, 2026, at the Collingwood Public Library to present alternative solutions that will improve the reliability of the drainage system in the project area of Cranberry Trail West just south of Highway 26. The PIC will consist of a presentation from the project team including an overview of the project and proposed alternative solutions, followed by an informal opportunity for attendees to ask questions and have conversations with the project team. Two PIC sessions will be offered: 2:00 – 4:00 p.m. and 6:00 – 8:00 p.m., with the same information shared at both. If you are unable to attend either in-person session, a recording of the presentation will be shared publicly following the event.

Date:
- December 8, 2026
Time:
- Session 1: 2:00 p.m. – 4:00 p.m.
- Session 2: 6:00 p.m. – 8:00 p.m.
Location:
- Collingwood Public Library, 55 Ste Marie St
Presentation recording:
- A link to watch the recorded presentation will be shared following the PIC.
If you have any questions related to the PIC or cannot attend in person and would like to share your thoughts, please contact one of the Project Team members. For those who plan to attend the PIC in person, there will be an opportunity to provide comments. To learn more about stormwater management in Collingwood, please visit the Stormwater Management Master Plan Engage Page.
Project Team
Proponent
Town of Collingwood
P.O. Box 157, 545 Tenth Line North
Collingwood, ON L9Y 3Z5
Mike Latimer, C.E.T.
Infrastructure Projects, Project Manager
mlatimer@collingwood.ca
705-445-1030
Consultant
Tatham Engineering Limited
115 Sandford Fleming Drive, Suite 200
Collingwood, ON L9Y 5A6
Jacob Macdonald, P.Eng.
Engineer, Project Manager
jmacdonald@tathameng.com
705-444-2565 x2161
Date of issue: November 25, 2026